SAT I 一日一問(wèn):2014年1月29日
The correct answer is D
Explanation
Machine X, working at a constant rate, can produce x bolts per hour, and machine Y, working at a constant rate, can produce x plus 6 bolts per hour. Therefore, in one hour, both machines working together at their respective rates can produce x plus x plus 6 equals (2 x) +6 bolts. It follows that in 4 hours, both machines working together at their respective rates can produce 4 ((2x) +6) equals (8 x) +24 bolts.
- 相關(guān)熱點(diǎn):
- 出國(guó)留學(xué)
- SAT考試
- 衛(wèi)星英文怎么說(shuō)